405 Sepulveda Pass "Jamzilla"

The closure consisted of a partial daytime lane reduction and a full nighttime closure of the freeway’s northbound lanes between Getty Center Dr. and Ventura Blvd. Approximately 5.6 miles long, the closures equal two thirds of the length of the entire I-405 Sepulveda Pass Improvements Project. Mr. Aaron Calderon prepared the TMP for the construction operation, provided agency coordination, obtained agency approval, and helped manage the construction operation. 

 405 Sepulveda Pass "Carmageddon I and II"

The planned 53-hour closures of the freeway were needed to dismantle the north/south side of the Mulholland Bridge over the 405. Anticipated to be a traffic nightmare with the extensive engineering and coordination efforts provided, it was a successful operation. As stated by the LA METRO, “Last weekend’s closure of the 405 FWY represented a historic moment in our regions long traffic history. Bracing- and preparing- for the worst, we were rewarded with a day of surprisingly smooth driving and lower stress.” DC Engineering staff were responsible for local agency coordination and design
Picture

Crenshaw/LAX Transit Corridor

DC Traffic is conducting City Street traffic control operations along with 405 freeway lane and full freeway closures. DC is offering full service planning, engineering and traffic control implementation services for the project. DC Engineering Group prepares traffic control, traffic signal, street lighting, and fiber optic plans. DC Traffic provides coordination services with local agencies, facilitates plan and permit approvals, and traffic control implementation services. 

Picture

Patsaouras Transit Plaza Project​

Situated in downtown Los Angeles and adjacent to Union Station, the Patsaouras Plaza Busway Station project will be a new transit busway station for the Metro Silver Line and other transit buses operating on the El Monte Busway. The design will place the busway south of Patsaouras Transit Plaza, in the median of the El Monte Busway next to US-101. The new busway station will allow buses travelling in both directions to serve Union Station with a minimum delay for passengers traveling to other destinations.
DC Traffic is performing traffic engineering services and obtained plan approval from the City of Los Angeles and Caltrans for the worksite traffic control plans. DC Traffic conducted City Street traffic control operations in the City of Los Angeles and along the 101 Freeway for Caltrans lane closures.
Picture

Southwest Gas - City of Big Bear

DC Traffic Control performed Traffic Engineering Services and Traffic Control implementation services for the installation of an 8” high pressure gas line project in the City of Big Bear California. Our services also included the coordination with the City, County, and State agencies for Engineering Plan review and approval. DC Traffic also assisted with permit approvals to expedite the start of the project for the client.
Picture

​Piaute Pipeline Phase 3 Relocation Project – Stagecoach, Nevada

DC Traffic Control performed Traffic Control implementation services for the relocation of the existing gas line project in the City of Stagecoach Nevada. Our services also included the coordination with the State agencies for field coordination services. DC Traffic is licensed in the State of Nevada and our crews are certified to perform traffic control operations within the state.

Picture

​​So. Cal Gas - City of Visalia

​DC Traffic Control performed Traffic Engineering Services and Traffic Control implementation services for the installation of a 4” steel gas line project in the City of Visalia, California. Our services also included the coordination with the City, County, and State agencies for permit and Engineering Plan review and approval.

Picture

​​So. Cal Gas - City of El Segundo

DC Traffic Control performed Traffic Control implementation services for the investigative pot holing services in the City of El Segundo, California to assist So. Cal Gas during the design phase of the project. Our crews provided expedited flagging and lane closures in support of the pot holing services.

Picture

PSEP (Pipeline Safety Enhancement Program)-      
 El Cajon, CA


​DC Traffic Control is currently supporting the PSEP program in El Cajon with traffic control and maintenance services along Main Street at the 8 Freeway. Our services include traffic control implementation and coordination services with the State of California (CALTRANS) and the City of El Cajon. 

​PSEP (Pipeline Safety Enhancement Program) – La Mesa, CA ​

DC Traffic Control supported the PSEP program in La Mesa with traffic control maintenance services. Our services included traffic control implementation and coordination services with the State of California (Caltrans and the City of La Mesa).