LA METRO Crenshaw/LAX Transit Corridor Project

Los Angeles 2014 - Present

The Crenshaw/LAX Transit Project is an 8.5-mile light-rail line, with eight stations, including Leimert Park and Hindry. The rail line will run between the Expo Line on Exposition Bl and the Metro Green Line. It will consist of aerial (La Brea Av/ La Cienega Bl and 405 Freeway/ Century Bl) and below-grade segments (Exposition Bl to 48th St/59th Pl to 67th St/ Los Angeles International Airport South Runways) with all remaining areas at-grade. 

DC Traffic Control has supported the design build team with traffic control services in the field along with permitting support. Our traffic control crews have successfully augmented the design build team to safely manage traffic operations during construction.

 